Call for a quote on 01375 398 398 or email us

Download brochure

GP360 Fusion

Upgraded, Eco-Friendly, 6 Person Mobile Welfare Unit

GP360 Fusion Mobile Welfare Unit

The GP360 Fusion is an advanced, eco-focused mobile welfare unit that builds on the practicality of the standard GP360 by adding smart energy-saving technology. Designed to be lightweight, compact, and fully towable, it offers all the essential on-site welfare facilities while significantly reducing fuel consumption, emissions and running costs.

This unit stands out due to its high-efficiency power system, allowing it to operate longer while using much less fuel. By running the generator for just two hours, the unit can deliver up to eight hours of heating and lighting, keeping operating costs low and cutting noise pollution. This makes it an ideal choice for contractors looking for a cleaner, quieter and more cost-effective welfare solution.

Built to meet full HSE welfare requirements, it provides everything your team needs in one space, from sanitation and washing facilities to drinking water, heating, and comfortable seating for up to six people. Practical, eco-friendly and easy to position on site, the GP360 Fusion brings modern energy-efficient performance to everyday site welfare.

Dimensions 3655 (L) x 2300 (W) x 2800 (H) (mm)
Dimensions including towbar 4920 (L) x 2300 (W) x 2800 (H) (mm)
Gross Weight 1815kg
Generator 6KVA
Fuel Tank 58 Litres
Key Features

The GP360 Fusion is enhanced with energy-saving technology, offering the same compact convenience with lower running costs, reduced emissions and a quieter on-site experience.

 

Lightweight, Towable and Fast to Deploy

Easily transported and ready to set up in around three minutes, allowing a single operator to manoeuvre and secure the unit with minimal effort.

 

Energy-Efficient Power Performance

Designed to run for just two hours and deliver up to eight hours of heating and lighting, dramatically cutting fuel consumption and noise levels on site.

 

Eco-Friendly Operational Design

Features built-in systems that help lower fuel use, reduce carbon emissions and extend generator life, making it a cleaner and more cost-effective welfare solution.

 

Fully Equipped, HSE-Compliant Facilities

Includes washing facilities, sanitary conveniences, drinking water access, rest areas and drying/changing space, ensuring full compliance with site welfare requirements.

 

Comfortable Seating for up to Six People

Provides a practical canteen area designed to accommodate six in comfort.

 

Enhanced On-Site Security

The GP360 Fusion is built with secure all-steel construction and supported by a ground-lowering mechanism for added on-site security. High-security features include a double-lock door, steel window shutters and a swing-operated secure nosecone, all ensuring a safe and reliable welfare space on any site.

 

Safe, Reliable and Ready to Use

Features a warm-water supply, kettle, microwave, lighting, water storage, safety alarms and comes supplied with a current electrical installation test certificate.

Images

For full details download product spec sheet

Download Spec Sheet